OFCI Procurement Manager - Data Center Construction

Sundt Construction • Temple, Texas • Full Time

Posted on Sat, Oct 3, 2026

Description

Job Summary

Sundt is seeking a highly organized and execution-focused Manager, OFCI Project Delivery to lead project-level deployment and field integration activities for Owner Furnished Contractor Installed (OFCI) equipment supporting advanced AI factory and data center infrastructure programs.

Embedded within the project delivery organization, this role will serve as the primary coordination lead between centralized supply chain teams, suppliers, OEMs, general contractors, subcontractors, commissioning teams, and field execution stakeholders to ensure successful deployment of mission-critical infrastructure equipment throughout the construction lifecycle.

The Manager will own project-level OFCI execution activities including local design and code-driven change coordination, inbound logistics oversight, construction sequencing alignment, equipment delivery readiness, site integration, asset tracking, startup coordination, and commissioning support activities.

This role will play a critical part in ensuring equipment deployment activities remain aligned with project schedules, site readiness requirements, commissioning plans, operational standards, and warranty compliance obligations across complex hyperscale infrastructure environments.

The ideal candidate combines strong construction coordination, supply chain execution, field logistics, and mission-critical infrastructure deployment experience with the ability to operate effectively in fast-paced construction environments.

Responsibilities

OFCI Project Deployment & Construction Coordination

Local Design Coordination & Change Management

Inbound Logistics & Delivery Readiness

Asset Control, Receiving & Preservation Management

OEM Startup & Commissioning Support Coordination

Supplier Performance & Site-Level KPI Management

Qualifications/Requirements

Physical Requirements

1.    Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.)
2.    May reach above shoulder heights and below the waist on a frequent basis
3.    May stoop, kneel, or bend, on an occasional basis.
4.    May use telephone, computer system, email, or other electronic devices to communicate with internal and external customers or vendors.
5.    Must be able to comply with all safety standards and procedures.
6.    Occasionally will climb stairs, ladders, etc.
7.    Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis.
8.    Will interact with people frequently during a shift/work day.
9.    Will lift, push or pull objects up to 50Ibs. on an occasional basis.
10.    Will sit, stand or walk short distances for up to the entire duration of a shift/work day.

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.


AuditFriendly salary estimate

The employer did not post a salary for this role. Based on AuditFriendly's salary intelligence model (comparable live postings, role, seniority, and location), we estimate base pay of $116,000–$163,000 per year (median ~$140,000). This is an AuditFriendly estimate, not an employer-provided figure.

More live procurement_manager roles

Browse all live jobs · Accounting & finance salary data

What the data says about this job

  • Advertised pay for Procurement Manager: a median of $125,000 across 1,504 priced postings. Explore the market

Measured from employers' own postings and public filings. How we measure

View the interactive listing →